• threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    0
    ·
    13 days ago

    There are nine methane-fueled engines, a gas-generator engine cycle, and landing legs that signal a future path toward reuse of the first stage. It could carry up to 12.5 metric tons to low-Earth orbit. If all goes well, Kolias said, the company could be ready to launch by 2032.

    Sounds like a reliable design. Looking forward to it!