• 1 Post
  • 1 Comment
Joined 1 year ago
cake
Cake day: November 14th, 2023

help-circle
  • The meter box hasn’t been installed yet but should be installed along the lower exterior wall of the garage (left side) probably about 3-4’ from the front and the main breaker panel is on the opposite side inside the garage.

    I think I’m going to have my switch in the ceiling space of the laundry room