irelephant [he/him]@programming.devM to iiiiiiitttttttttttt@programming.devEnglish · 1 month agoIts braidedprogramming.devimagemessage-square45linkfedilinkarrow-up1387arrow-down13
arrow-up1384arrow-down1imageIts braidedprogramming.devirelephant [he/him]@programming.devM to iiiiiiitttttttttttt@programming.devEnglish · 1 month agomessage-square45linkfedilink
minus-squarePommes_für_dein_Balg@feddit.orglinkfedilinkarrow-up1·1 month agoI’d obviously plan the initial setup, start with connecting ports close together via short cables, then put the longer connections on top, avoid unnecessary crossings. And when switching out a cable, look for the most direct path
minus-square0x0@infosec.publinkfedilinkEnglisharrow-up4·1 month agoCable trays is the magic word. Any rack larger than 2u that see frequent patching need them no matter what accounting thinks.
I’d obviously plan the initial setup, start with connecting ports close together via short cables, then put the longer connections on top, avoid unnecessary crossings.
And when switching out a cable, look for the most direct path
Cable trays is the magic word. Any rack larger than 2u that see frequent patching need them no matter what accounting thinks.