FAQ
- When next launch? (Flight 12) NET 2026.
- When previous launch? (Flight 11) Starship flight 11 launched on 2025-10-13 at 23:23 UTC.
- What was the result? All mission objectives fulfilled. Ship performs successful landing burn and splashdown, despite intentional missing tiles on heatshield. Second successful deployment of Starlink simulators. Booster successfully tested a 13-5-3 engine landing profile.
Previous Flights
Click to expand
- Flight 1: S24 and B7. First full stack launch, RUD before stage separation.
- Flight 2: S25 and B9. Successful stage separation, booster RUD during boostback burn, ship RUD shortly prior to scheduled SECO.
- Flight 3: S28 and B10. Booster performs a successful boostback burn, but experiences RUD during landing burn. Ship makes it past SECO, but loses attitude control and is destroyed on reentry.
- Flight 4: S29 and B11. First successful booster water landing. Ship survives reentry despite burn-through on forward flap, and performs a successful water landing.
- Flight 5: S30 and B12. First booster catch with chopsticks. Ship performs successful water landing.
- Flight 6: S31 and B13. Booster offshore divert due to damage to catch tower during launch. Ship performs successful water landing.
- Flight 7: S33 and B14-1. First V2 Ship launch. Harmonic oscillation on ship causes RUD before SECO. Booster is caught by chopsticks.
- Flight 8: S34 and B15-1. Engine failure on ship causes RUD before SECO. Booster is caught by chopsticks.
- Flight 9: S35 and B14-2. First booster reflight. Ship makes it past SECO, but loses attitude control and is destroyed on reentry. Booster RUD upon landing burn startup prior to planned splashdown.
- Flight 10: S37 and B16. All mission objectives fulfilled. First V2 ship to make it through reentry to landing burn and splashdown. First successful deployment of Starlink simulators. Booster successfully tested landing without one centre engine, using an engine on the middle ring to compensate.
- Flight 11: S38 and B15-2. All mission objectives fulfilled. Ship performs successful landing burn and splashdown, despite intentional missing tiles on heatshield. Second successful deployment of Starlink simulators. Booster successfully tested a 13-5-3 engine landing profile.
Quick Links
Nerdle Cam | Lab Cam | Sapphire Cam | Sentinel Cam | Rover Cam | Rover 2.0 Cam | Rocket Ranch Cam | Plex Cam | NSF Starbase Live
Starship Dev December | Starship Dev November | Starship Dev October | Starship Dev September | Starship Dev August | Flight 10 launch thread | Starship Dev July
Official SpaceX Starship Update Video (2024-04-06)
Road closures, road delays, and beach closures
Vehicle Status
*As of 2025-10-21
| Ship | Location | Status | Comment |
|---|---|---|---|
| S20 | Rocket Garden | Pending scrapping? | |
| Test Tank 16 | Sanchez | Resting | Cryo tested four times between July and September. Sliding plates added to the catch points on Jan 27th. Moved to Sanchez Mar 15th. |
| S38 | Indian Ocean | Destroyed | Parts spotted in December. Nosecone stacked on payload bay as of Mar 28th. Rolls to Massey’s Jul 28th. Cryo tested Jul 30th. Rolls back to Megabay 2 Aug 1st. Aft flap installed Aug 25th. Static fired Sep 22nd. Launched on Oct 13th, destroyed on impact following a successful landing burn and splashdown. |
| S39.1 | Megabay 2 | Assembly | Parts spotted (Aug 25th) |
| S39 | Megabay 2 | Stacking | Parts spotted (Apr 9th). Forward flaps installed July 29th and 31st. Stacking began Oct 20th. |
| S40 | Starfactory | Assembly | Parts spotted (Apr 10th). |
| S41 | Starfactory | Assembly | Parts spotted (May 10th). |
| S42 | Starfactory | Assembly | Parts spotted (Jul 4th). |
| S43 | Starfactory | Assembly | Parts spotted (Jul 4th). |
| S44 | Starfactory | Assembly | Parts spotted (Jul 4th). |
| S45 | Starfactory | Assembly |
| Booster | Location | Status | Comment |
|---|---|---|---|
| B12 | Rocket Garden | Pending scrapping? | Cryo x2, Static fire Jul 15th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched as IFT-5 on Oct 13, returned to launch site for successful chopstick catch. Moved to Megabay 1 Oct 15th. Moved to Rocket Garden Sep 27th. |
| B15-2 | Gulf of Mexico | Destroyed | Stacked from July to September 2024. Methane tank cryo test Dec 27th, full cryo test Dec 28th. Static fired Feb 9th. Launched and landed Mar 6th. Static fired Sep 7th. Moved to Rocket Garden Sep 26th. Launched on Oct 13th, destroyed on impact following a successful landing burn. |
| B16 | Gulf of Mexico | Destroyed | Stacking completed by Dec 26th 2024. Cryo tested Feb 28th. Static fired Jun 6th. FTS potentially installed Jun 18th. Hot staging adapter removed Jun 19th. FTS installed Aug 17th. Rolled out to launch site Aug 21st. Launched on 2025-08-26, destroyed on impact following a successful landing burn. |
| B17 | Rocket Garden | Pending engine install | Parts spotted. First two sections moved to Megabay 1 Jan 4th. Fully stacked by Apr 7th. Cryo tested Apr 9th. |
| B18.1 / Test Tank 17 | Massey’s | Cryo testing | Test article for Booster v3. Parts spotted Feb 24th, Apr 21. Cryo tests start Jun 2nd and 3rd, continue until tank bursts Sep 18th. |
| B18.3 | Massey’s | Testing | Parts spotted Aug 27th. Moved to Massey’s Sep 20th. |
| B18 | Megabay 1 | Stacking | Parts spotted May 19th. |
| B19 | Starfactory | Stacking | Parts spotted Aug 11th. |
Resources
- LabPadre Channel | NASASpaceFlight.com Channel
- NSF: Boca Chica Production Updates Thread
- NSF: Elon Starship tweet compilation
- SpaceX: Website Starship page | Starship Users Guide (2020, PDF)
- FAA: SpaceX Starship Project at the Boca Chica Launch Site
- FAA: Temporary Flight Restrictions NOTAM list
- NASA: Starship Reentry Observation (Technical Report)
- Hwy 4 & Boca Chica Beach Closures (May not be available outside US)
- Production Progress Infographics by @RingWatchers
- Raptor Tracker by @SpaceRhin0
- Acronym definitions by Decronym
- Tim Dodd: Starbase Tour with Elon Musk, Part 1 | Part 2 | Part 3
- Tim Dodd: 2022 Elon Musk Interviews, Starbase/Ship Updates | Launch Tower | Merlin Engine | Raptor Engine
- Tim Dodd 2024 Elon Musk Interviews: Starfactory tour | Pad tour and post-IFT-4 interview
- Tim Dodd 2025 pre-Flight-9 Elon interview
2026-01-22:
- Jan 21st addendum: ViX video clip of the Starlink PEZ dispenser loader moving from Starfactory to Remedios Ave.
- Build site: S40 nosecone in Starfactory has forward flaps. (cnunez)
- Launch site: Two structures with piping are delivered to the air separation site. (NSF, ViX, cnunez, Velocity_Photos)
- Both structures are offloaded, and one is lifted into position. (Avid Space, ViX 1, ViX 2, Sorensen)
- Some pipe pieces are delivered and offloaded at the D4 gate. (ViX)
- Closeup of some equipment at the air separation site. (Sorensen)
- Drilling at Pad 1 continues. (Anderson)
- Massey’s: Overnight, test tank S39.1 performs its 7th cryo test. (Avid Space, ViX)
- The second V-shaped section is reinstalled on the mystery structure. (ViX)
2026-01-21:
- Massey’s: Overnight, B18.3 was crush-tested to failure, buckling just below the common dome. (ViX 1, ViX 2)
- In the evening, venting from Massey’s indicates another night of testing, presumably S39.1 (Sorensen)
- Build site: The Starlink PEZ dispenser loader exits Starfactory and travels down Highway-4 making a right turn onto Remedios Ave, likely headed to Megabay 2. (wvmattz)
- Launch site: Overnight, another large tank is moved from Brownsville Port to Pad 2. (ViX)
- During the day, another smaller tank is delivered to the air separation site and lifted into position by the LR1500 and LR11000 cranes. (ViX, ViX 2)
- Drilling at Pad 1 continues. (NSF)
- Road delay for “Port of Brownsville to ASU” is posted for Jan 21st 23:59 to Jan 22nd 04:00. (starbase.texas.gov, archive, ViX)
2026-01-20:
- Launch site: Overnight, a large tank is moved from Brownsville Port to Pad 2. (Avid Space, ViX, Gisler)
- During the day, another tank is delivered to the air separation site. (ViX)
- The LR11000 crane is raised, and weights are added to the rear ballast tray. With the LR1500 crane, it executes a dual lift of the newly delivered tank. (ViX)
- Another road delay for “Port of Brownsville to Pad” is posted for Jan 20th 23:59 to Jan 21st 04:00, likely for delivery of a second tank similar to the one the previous night. (starbase.texas.gov, archive, ViX)
- Drilling begins for the Pad 1 flame trench. (Golden, Anderson 1, Anderson 2, Anderson 3)
- Build site: A four-ring barrel section exits Megabay 2 and moves to Sanchez, presumably for scrapping. (ViX)
- Aft flap 2 of 2 (flap 4 of 4) is installed on S39. (ViX, Velocity_Photos)
- Massey’s: Overnight, test tank 39.1 performs its 6th cryo test. (ViX)
- A second V-shaped section is lifted and welded to the mystery structure, then possibly cut free and removed. (ViX 1, ViX 2)
- The can-crusher surrounding test tank 17 (B18.1) is being dismantled. (ViX)
- B18.3 is crush-tested to failure, buckling just below the common dome. (Avid Space, efraser77, colleenliedtke, Golden 1, Golden 2)
2026-01-19:
- Massey’s: Overnight, the booster cryo stand moves from Massey’s to the build site. (NSF, ViX, Gisler, Sorensen)
- S39.1 performs its 5th cryo test. (NSF, ViX, cnunez)
- A V-shaped section is lifted for welding to the mystery structure. (ViX)
- Build site: Aft flap 1 of 2 is installed on S39. (Avid Space, ViX)
- Launch site: Road delay is posted for Jan 19th 23:59 to Jan 20th 04:00 for “Port of Brownsville to Pad”, possibly for delivery of a tank at the air separation site. (starbase.texas.gov, archive, ViX, Anderson, Guidry)
- Two new vaporisers are delivered and lifted into place at the tank farm. (ViX)
- The LR1500 crane is erected, and the LR11000 crane is laid back down. (ViX, Gisler)
- Pouring of the concrete wall near Pad 2 continues. (ViX)
- Zack Golden speculates on Pad 1 upgrades.
2026-01-18:
- Massey’s: Road delay is in place for Jan 18th 23:59 to Jan 19th 04:00 for “Masseys to Production”, likely for the transport of the booster cryo test stand. (ViX, RoughRidersShow)
- Air separation site: Reassembly of the LR11000 crane is completed. (ViX, wvmattz)
- Assembly of the LR1500 (or LR1300?) crane continues. (ViX)
- Florida: Gigabay construction continues. (CarstensPete, rbalephoto)
2026-01-17:
- Massey’s: Overnight, test tanks S39.1 and B18.3 perform cryo tests. (ViX)
- Road delay is posted for Jan 18th 23:59 to Jan 19th 04:00 for “Masseys to Production”. (starbase.texas.gov, archive)
- Air separation site: More parts for reconfiguration of the LR11000 crane are delivered. Assembly of a LR1300 crane also begins. (ViX 1, ViX 2, Sorensen)
2026-01-16:
- Jan 15th addendum: The methane and LOx booster quick disconnects are tested a couple times and left in the extended position, possibly to allow access behind. (ViX)
- Launch site: Overnight, the SpaceX LR11000 crane is moved from Pad 2 to the air separation site. (NSF, Avid Space, ViX, Sorensen)
- Reassembly of the LR11000 crane begins. (ViX, cnunez)
- The Pad 2 chopsticks and ship quick disconnect are tested. (Avid Space, ViX, Anderson)
- RGV Aerial post recent flyover photos of Pad 2.
- Build site: Gigabay construction continues. (Gisler 1, Gisler 2)
- SpaceX subtly rickroll NASASpaceflight viewers. (Anderson)
- Massey’s: Overnight, possible ambient temperature pressure test on one or more of the tanks, difficult to tell which. (ViX)
- Interesting horizon refraction phenomenon visible on Avid Space Rocket Ranch Cam. (ViX)
- Gisler posts photos of the mystery structure (static fire stand?) and B18.3 in the can crusher assembly.
- B18.3 begins its 9th test, and S39.1 begins its 4th test. (wvmattz, TrackingTheSB)
2026-01-03:
- Launch site: Excavations at Pad 1 continue. Venting observed at the Pad 2 tank farm. Minor movements of the LR11000 crane and the continuous flight auger are noted. (ViX)
- Ship quick disconnect vent is likely installed on Tower 2. The vent appears to have three outlets. (ViX)
- Build site: Raising of tower crane #1 is completed. All four cranes are equal heights again. (ViX)
- Massey’s: Erection of the mystery structure (presumed static fire test stand) continues. (ViX, Sorensen 1, Sorensen 2)
Other:
- Satellite imagery timelapse and comparison of groundwork at SLC-37 in Florida. (Anderson, 2025-12-31)
2026-01-01:
- Raising of tower crane #2 is completed. (ViX)
- S39 is surrounded by scaffolding in Megabay 2. (Starship Gazer)
2026-01-02:
I’m late, but happy new year!
Thanks, you too!
2025-12-14:
- No significant activity reported.
2025-12-15:
- Installation jig for the LOX header exits Megabay 1. (ViX)
- Road delay is posted for Dec 15th 23:59 to Dec 16th 04:00 for “Pad to Port of Brownwsville”, likely for removal of a tank from the Pad 1 tank farm. (ViX)
- The LR11000 crane lifts one of the Pad 1 deluge tanks onto a transport. (ViX)
- The crane at the air separation site departs and is replaced by another crane. (ViX)
2025-12-16:
- Overnight, the deluge tank from Pad 1 is moved to Brownsville Port. (ViX)
- An empty transport arrives at Pad 1. (ViX)
- Road delay is posted for Dec 16th 23:59 to Dec 17th 04:00 for “Pad to Port of Brownwsville”, likely for removal of a second tank from the Pad 1 tank farm. (ViX)
- Deluge tank is loaded onto transport at Pad 1. (ViX)
- Priel timelapse of Gigabay construction over the past month.
- McGregor: R3.77 (with vacuum nozzle) arrives at the testing area. First R-vac since R3.8. (Rhin0)
2025-12-17:
- Build site: Overnight, B19’s F2:4 section moves from Starfactory to Megabay 1. (ViX)
- The lifting jig for the booster forward section (with integrated hot-staging ring) enters Megabay 1. (ViX)
- Massey’s: Overnight, Test Tank B18.1 undergoes its 11th round of cryo testing, inside the can crusher last night.
- Test Tank S39.1 is removed from the test stand. (ViX)
- Pad 1: The last remaining large tank at the deluge area is removed for transport. (ViX)
2025-12-18:
- Pad 1: The CO2 tank is removed. (ViX)
- S33’s payload section moves from Starfactory to the scrap yard. (ViX, TrackingTheSB)
- Road delay is posted for Dec 18th 23:59 to Dec 19th 04:00 for “Masseys to Production”, likely for ship stand. (ViX, CeaserG33)
- B19’s FX:3 section (with integrated hot-staging ring) moves from Starfactory to Megabay 1. (ViX, wvmattz)
2025-12-19:
- Massey’s: Overnight, Test Tank B18.1 undergoes its 12th round of cryo testing. (ViX)
- Ship cryo stand moves from Massey’s to the production site. (Priel)
- Erection of a mystery vertical gantry-type structure begins, possible a static fire test stand. (ViX, Priel, Killip 1, Killip 2)
- Build site: A mystery ring section moves from Starfactory to Megabay 2. (ViX)
- The ship quick disconnect has had the face-plate fitted and currently being fitted out with hoses. Gigabay construction continues. (ViX, Starship Gazer)
- Tower crane #3 is raised by 3 sections. (ViX)
- Two road delays are posted for Dec 20th 23:59 to Dec 21th 04:00. One for “Port of Brownsville to ASU” and one for “Production to Masseys to Production”.
- Christmas parade. (ViX, Priel)
2025-12-20:
- Tower crane #3 is raised by 4 sections. (ViX)
- The final barrel section for B19 enters Megabay 1. (ViX, TrackingTheSB)
- Florida Gigabay construction continues. (Bergeron)
2025-12-21:
- Overnight, parts for the new static fire mount structure are moved to Massey’s. (mymatrixplug, NSF)
- Raising of tower crane #4 begins. (ViX)
- A new chopsticks actuator is delivered to Pad 2. (ViX)
- A large tank is delivered to the air separation site. (ViX)
2025-12-22:
- Raising of tower crane #4 is completed. (ViX)
- Massey’s: A second truss section is erected for the mystery structure. (ViX, TrackingTheSB)
2025-12-23:
- Test Tank 39.1 moves from Massey’s to Sanchez, then to Starfactory. (ViX 1, ViX 2, TrackingTheSB)
- Construction of the third level of Gigabay begins. (ViX)
- Landing tank stand moves from Starfactory to Megabay 1. (ViX, NSF)
2025-12-24:
- Landing tank jig exits Megabay 1, indicating that B19 stacking is likely complete. (ViX 1, ViX 2)
- SpaceX confirm completion of B19 stacking.
2025-12-25:
- No significant activity reported.
2025-12-26:
- No significant activity reported.
2025-12-27:
- Florida Gigabay construction continues. (Bergeron)
2025-12-28:
- Massey’s: Crossbracing is installed on the mystery structure. (ViX)
- Build site: Installation of flex hoses on the Pad 2 ship quick disconnect is underway. (ViX)
- A couple of nilgai are spotted. (ViX)
2025-12-29:
- Overnight, the Pad 2 tank/pump farm undergoes extensive testing on both the methane and LOx sides. (ViX, Priel)
- Road delay is posted for Dec 29th 23:59 to Dec 30th 04:00 for “Production to Masseys”. (ViX)
- A new cross-braced vaporiser is delivered to the launch site. (ViX)
- Five cages of composite overwrap pressure vessels are moved from the the build site to Massey’s. (ViX)
- McGregor: Ten Raptor 2 engines are moved towards the scrap yard. R2–, R5–, R—, R—, R—, R461, R5-4, R5–, R472, R525 (Rhin0)
- Florida: Marmac 31 delivers a tank to the KSC turn basin. Marmac 31 is likely the barge which will be used to transport vehicles from Starbase to Florida. (Bergeron, Dontchev)
2025-12-30:
- Massey’s: Overnight, a 2-ring section consisting of a ship skirt section and a can-crusher interface is moved to Massey’s. (ViX, efraser77 1, efraser77 2)
- Another truss frame is added to the mystery structure. (ViX)
- Build site: A mystery test stand moves from Sanchez to Megabay 2. (rocketjunkie94)
- Pad 2: The newly delivered cross-braced vaporiser is lifted into place at the tank farm. (ViX)
- McGregor: Six more Raptor 2 engines move to the scrap yard. (wvmattz)
2025-12-31:
2026-01-04:
- Massey’s: Overnight, X-frames are moved from Sanchez to Massey’s. (ViX)
- Construction of the presumed static fire test stand continues. (Sorensen 1, Sorensen 2)
- Launch site: Installation of clamp arm linkages and doors on the Pad 2 launch mount begins. (ViX)
- Installation of bumper pads on ends of the Pad 2 chopsticks begins. (Anderson 1, Anderson 2)
- RGV Aerial post a recent flyover photo of Pad 1. Demolition and excavation continues.
- Build site: Gigabay construction continues. (ViX, RGV Aerial)
- McGregor: Recent flyover photos of the mystery tent, components testing area, Raptor north stand, and Raptor vertical stand. (Cuker)
2026-01-05:
- Pad 1: The LR11000 crane removes two of the remaining tanks from the deluge area, and the tanks depart from the launch site. (ViX 1, ViX 2)
- The LR11000 crane moves towards Pad 2. (TrackingTheSB)
- Pad 2: A new “Rover 3” camera feed goes live. (Avid Space, formerly LabPadre)
- Clamp arm door #10 is installed on the launch mount. (ViX)
- Massey’s: A cross-brace is added to the presumed static fire test stand. (ViX)
- Five more cages of composite overwrap pressure vessels are transported to from the build site to Massey’s for testing. (ViX, TrackingTheSB)
- Other: zh_sos1 posts a series of explanatory renders of booster V3 internal plumbing. (Tweet 1, tweet 2, tweet 3, tweet 4, tweet 5, tweet 6, tweet 7, tweet 8, tweet 9, tweet 10)
2026-01-09:
- Massey’s: Overnight, Test Tank 17 (B18.1) undergoes its 15th round of testing. (ViX, Priel)
- The LR11000 has lifted the ship aft section back onto the B18.3 test tank and added the “can-crusher” structure. (ViX, Gisler 1, Gisler 2)
- The first tie rod for the crush test is fitted to the B18.3 test tank and then removed. (ViX)
- Build site: The whiffletree lifting jig is moved to the left side of Megabay 2. (ViX)
- S39.1 moves from Starfactory to Megabay 2. (NSF 1, NSF 2, ViX, Gisler)
- S39.1 is attached to the bridge crane via the whiffletree lifting jig. (ViX, cnunez 1, cnunez 2)
- S39.1 is transferred to the ship cryo test stand. Docking hardware is visible on the side of the tank. (ViX 1, ViX 2, TrackingTheSB, cnunez)
- Launch site: Clamp arm doors #16 through #18 are installed in the Pad 2 launch mount. (ViX)
- Crane matting is delivered and laid out at the air separation site, likely indicative of a new crane arriving soon. (ViX)
- Rebar for a wall is erected near the D1 gate, and a brief chopsticks test is conducted at Pad 2. (ViX)
- A set of composite overwrap pressure vessels depart from Starbase. (Gisler 1, Gisler 2, Sorensen 1, Sorensen 2)
- McGregor: Another six Raptor 2 engines leave the site. (Rhin0)
- Florida LC-39A: Crews spotted working on the recently delivered ship quick disconnect arm. (wvmattz)
2026-01-10:
- Road delay is posted for Jan 11th 23:59 to Jan 12th 04:00 for “Production to Masseys”. (starbase.texas.gov, archive, ViX)
- Launch site: Clamp arm door #19 and #20 are installed in the Pad 2 launch mount. (ViX 1, ViX 2, TrackingTheSB, Killip)
2026-01-15:
- Jan 14th addendum: Pad 2 ship quick disconnect arm is tested. (ViX)
- Massey’s: Overnight, Test Tank 17 (B18.1) performs its 16th round of cryo test, lasting 11 hours. (ViX)
- Installation of tie-down rods on the can-crusher assembly surrounding test tank B18.3 continues. (ViX)
- Launch site: The LR11000 crane is undergoing reconfiguration. Two sections of the boom depart from the site. (ViX)
- A frame is lifted up to the Pad 2 ship quick disconnect arm. (ViX)
- Road delay is posted for Jan 15th 23:59 to Jan 16th 04:00 for “Pad to ASU”, likely for the LR11000 crane and associated parts for reconfiguration. (starbase.texas.gov, archive, ViX, Fraser)
- Build sites: Gigabay construction, both in Texas and Florida, continues. (Bergeron / colleenliedtke)
2026-01-13:
- Massey’s: Another cross brace is added to the mystery structure. (ViX)
- Two tie rods are installed on the can-crusher assembly surrounding around test tank B18.3. (ViX 1, ViX 2)
- Road delay is posted for Jan 14th 23:59 to Jan 15th 04:00 for “Masseys to Production”. (starbase.texas.gov, archive)
- Build site: In Megabay 2, a lifting jig is attached to S39. (Avid Space, ViX)
- Launch site: The methane recondenser tank is lifted out of the Pad 1 tank farm, followed by the lowering of the associated vent stack. (Avid Space, ViX)
- Parts for a reconfiguration of the LR11000 crane are delivered, and a new Grove crane arrives. (ViX)
- Work on the air separation unit continues. (ViX)
- Cribbing is arranged in a pattern nearby. (ViX)
- Erection of the concrete wall forms near Pad 2 continue. (ViX)
- Florida LC-39A: Ship quick disconnect arm is installed on the tower. (NSF 1, NSF 2, Avid Space)


