• Asetru@feddit.org
    link
    fedilink
    arrow-up
    1
    ·
    2 days ago

    Battery pack configurations between four and eight units (360 to 720 kWh) are possible.

    the coaches can be charged […] by cable with up to 250 kW DC (charging port available on the left or right)

    Imagine drawing 250 kW and still needing three hours to fully charge…

    I mean, I get that drivers need breaks anyway, so this won’t be an issue for the operation, but damn, that’s a lot of energy. I just think it’s impressive.